Modernization completely on schedule

May 13, 2020
Foto: Baustellenkamera
©IAKW-AG, Baustellenkamera

Despite difficult general conditions in times of Covid19, our construction and engineering team, together with the executing companies, managed to keep to the tight schedule for our renovation. Take a look at the current construction site pictures with us - we are moving forward!

Dismantling hall X5

Hall X5 is currently being dismantled. The floor structure has already been largely removed, and the last hall walls and wall supports are currently being dismantled.

Hallenabbau der Halle X5 des Austria Center Vienna

©IAKW-AG

Foundation building entrance

The foundation for the supports of the entrance building has already been concreted. In the next step, the steel supports are fixed on the already visible mounting plates.

Baustelle beim Austria Center Vienna

©IAKW-AG

Steel construction platform X3 / X4

The steel construction of the stage has already been completed in the foyer of halls X3 / X4. This will be the connection area for the future panoramic walk.

Hallenabbau der Halle X5 des Austria Center Vienna

©IAKW-AG

Construction site camera 1

he new perspective of construction site camera 1 provides an overview from the west parking lot to the new panorama walk. The steel supports have already been set up (in front of the escape staircase right), and the elements of the panorama walk (center) have already been assembled on site.

Baustellenkamera mit Blick auf das Austria Center Vienna

©IAKW-AG

Construction site camera 2

The new construction site camera 2 will follow the construction of the entrance building from the promenade.

Hallenabbau beim Austria Center Vienna

©IAKW-AG

A look into the future

danubesail open

The Austria Center 2022 with an open danubesail and the new entrance building. In the background the new panoramic walk.

Ansicht Donausegel offen

©IAKW-AG, begehungen.de

danubesail closed

For big events, the space under the donauSEGEL is closed to Exhibition Hall X5.

Ansicht Donausegel geschlossen

©IAKW-AG, begehungen.de

New access building exterior view

The new access building takes you directly to level 1 with the escalator without going through the entrance hall.

Rendering Zugangsgebäude neu des Austria Center Vienna

©IAKW-AG, begehungen.de

New access building interior view

Rendering Innenansicht Zugangsgebäude neu des Austria Center Vienna

©IAKW-AG, begehungen.de

Panoramawalk Exterior view

The new panoramic walk connects the building directly to the exhibition halls.

Rendering Skywalk Außenansicht des Austria Center Vienna

©IAKW-AG, begehungen.de

Panoramawalk interior view

Skywalk Innenansicht des Austria Center Vienna

©IAKW-AG, begehungen.de

danubesail

View from the new entrance building to Exhibition Hall X5.

Ansicht Donausegel Eingang zum Austria Center Vienna

©IAKW-AG

General
+43 1 260 69 0

Mon—Fr 9am—3pm (MEZ)

[email protected]
Sales
+43 1 260 69 355

Mon—Thu 9am—4pm, Fri 9am—12pm (MEZ)

[email protected]